New Build Permit - Document Checklist
Complete checklist of all required documents for new building construction permits
Application Form*
Complete official building permit application form signed by property owner and licensed professional
Site Plan*
Detailed site plan showing property boundaries, setbacks, existing and proposed structures, north arrow, and scale (minimum 1:200)
Floor Plans*
Complete floor plans for each level showing dimensions, room names, fixtures, and door/window locations (minimum scale 1:100)
Elevations*
Building elevations from all four sides showing exterior materials, heights, and architectural features
Structural Drawings*
Structural plans and details prepared by a registered structural engineer
Land Ownership Documents*
Current deed or certificate of title proving ownership of the property
Town & Country Planning Approval*
Valid planning permission from the Town and Country Planning Division
Soil Investigation Report
Geotechnical report for foundations (required for structures over 2 stories)
Environmental Clearance
Environmental impact assessment (required for developments over 5,000 sq ft)
- All drawings must be prepared by a registered architect or engineer
- Submit 3 hard copies and 1 digital copy (PDF) of all documents
- All drawings must include the project name, address, and date
- Digital files must follow naming convention: ProjectAddress_DrawingType_Date
- Application fee must be paid before submission
- All documents must be current (not older than 6 months)
Processing Time
4-6 weeks from complete submission
Application Fee
Starting at $1,500 TTD
Validity Period
Permit valid for 2 years from issue date
Contact our Building Department for assistance with your application.
Phone: (868) 625-3121
Email: building@gov.tt
Hours: Mon-Fri 8:00 AM - 4:00 PM
